bed-parallel fracture
常見例句
- The Changpo reverse anticline controls the location of Changpo-Tongkeng deposit, while the bed-parallel shear fracture zone and thrust fault control the ore bodies.
長坡倒轉背斜控制長坡-鋼坑礦床的產出,層間剪切破碎帶和逆掩斷層控制著礦體的空聞位置。 返回 bed-parallel fracture