high side-slope
基本解釋
- [交通運(yùn)輸工程]高邊坡
英漢例句
- The high-fill subgrade is filled with levels strictly by design side slope, which cannot be changed wantonly.
高填方路堤嚴(yán)格按設(shè)計(jì)邊坡分級(jí)填筑,不得任意改變?cè)O(shè)計(jì)邊坡。 - This paper expounds the principle of earth grid strengthening, introduces the strengthening techniques and experiences of high-filled embankment side slope using the method.
闡述了土工網(wǎng)格加固高填路堤邊坡的加固機(jī)理并結(jié)合某工程實(shí)例,介紹了土工網(wǎng)格加固高填路堤邊坡的施工方法和施工體會(huì)。 - The metallographic examination of joint in different welding temperature proves that the joint metal on the side of high-speed steel has a gentle structure slope at the 800 ℃.
通過(guò)對(duì)不同溫度接頭的金相檢驗(yàn)證明:在800℃時(shí)高速鋼一側(cè)組織梯度較??;
雙語(yǔ)例句
專業(yè)釋義
- 高邊坡
Finally,based on the quantitative analysis,considerng actual situation, the high side slope instability preventive measure rationalization proposals are proposed, which provides the reference and the theory basis for the road maintenance in the process of using.
最后在定量分析的基礎(chǔ)上,結(jié)合實(shí)際情況提出了高邊坡失穩(wěn)的預(yù)防措施合理化建議,為道路運(yùn)營(yíng)過(guò)程中的養(yǎng)護(hù)決策提供參考資料和理論依據(jù)。