quay crane scheduling
基本解釋
- [計算機科學技術]裝卸橋調度
- [自然科學]岸橋調度
英漢例句
- This paper builds a simulation and optimization model for minimizing the total stay time of ships, which aims at the problem of berth and quay crane (QC) scheduling.
針對集裝箱碼頭的泊位分配及岸邊集裝箱起重機(岸橋)調度問題,本文建立了最小化總體船舶在港時間的仿真優(yōu)化模型。 - Thirdly, we study the problem that quay cranes perform loading and unloading operations simultaneously in the same ship-bay, namely quay crane dual cycling scheduling problem.
然后,研究裝卸橋在同一貝位內同時進行裝船與卸船作業(yè)的調度問題,即同貝同步裝卸調度問題。
雙語例句
專業(yè)釋義
- 裝卸橋調度
- 岸橋調度